Anita Quibell

Anita Quibell

I am a parks professional with 40 years’ experience in the industry and a proven record of building strong relationships and implementing strategies that deliver results. I have worked extensively in Australia’s local government in various operational and planning roles. I have been involved in the development of strategic plans and the implementation of business […]

Margaret Mahy Playground Maintenance Plan

Margaret Mahy Playground

Following the 2011 Christchurch earthquake, the Government’s Recovery Plan had a “city-wide family playground” as one of the elements of the East Frame. Xyst were engaged to prepare a comprehensive maintenance plan that captured warranty information and maintenance requirements for all items of play equipment and life cycle replacement timing and costs for surfacing, lighting […]

Andy Smith

Andy Smith

I have over 30 years local government experience, holding a range of positions within community development, open space, recreation and sport and community assets portfolios. I was instrumental in developing the first Open Space and Sport Plan for the newly formed City of Onkaparinga in 1998 and for the last 25 years I have been […]

Playground Maintenance Plan

Xyst developed a playground maintenance plan for all of Napier City Council’s playgrounds based on each playgrounds level of service. Maintenance plans also took into consideration warranties and supplier contact details. I-Auditor templates were developed to eliminate paper and allow maintenance checks to be undertaken via a mobile phone. All information is stored in one […]

Parks & Facilities Management

Xyst was brought on board after a thorough risk and performance evaluation of the Mackenzie District Council’s parks and community facilities operations. Xyst was then asked to fill a sudden staff management gap, which quickly evolved into a long-term commitment to manage the District’s public facilities, parks, and community spaces. Throughout this period, Xyst’s team […]

Open space contract quality audits and asset management condition inspections

The City of Whittlesea maintains 2,173 sites within its municipal boundaries where individual assets are located to be audited. All assets are inspected across the full range of park categories and measured for compliance with the relevant KPIs and outcomes detailed in the parks services contract, acting impartially and without bias. In any given month […]

Contract Performance Auditing

Nelson City Council engaged Xyst to carry out contract performance auditing. Xyst has developed an inspection template using a mobile app that allows performance against a set of performance measures from contract specifications to be scored from 1 to 5 and to produce an overall percentage score for each location. Activities audited include grass maintenance, […]

Yardstick Parks User Surveys

Yardstick Parks User Surveys were developed in around 2008 initially as a paper based intercept survey designed to target park users and measure satisfaction with a range of parks related services and features. The product was initially called Parkcheck and is still known as this by some users. The surveys were taken online in 2015 […]

Play Strategy Review

Xyst worked with the client to transition them from a traditional Playground Strategy to a Play Strategy. The Strategy analysed the current state of Napier’s playgrounds, introduced play beyond playgrounds, youth facilities and touched on outdoor exercise equipment and splash pads. Five key outcomes underpin this Strategy.

Child Care Centre Playground Performance Assessment

Key findings of the performance assessments, accompanied by some high level analytical commentary was completed, with each playground assigned an overall performance assessment score. Analysis included site design, play value, quantity of play items, equipment condition, safety surface condition and an assessment of remaining life of the asset.

Playground Performance Assessment

Undertook an assessment of each playground using the Playable Space Assessment Tool, Play England 2009, which has been adapted by Xyst. The tool enabled an assessment to be made of location, play value and ancillary facilities to produce an overall percentage score for each playground, ranking each playground to enable priorities to be identified objectively […]

Westshore Playground Renewal – Scoping and Procurement for Design and Build

Key aspects of the project included: Scope development following community consultation Assessment of exisiting play structures Arrangement of site survey and consenting investigations Development of design guidelines for the playground design and build Procurement of contractors for playground removal (including evaluation) Procurement of a playground design and build contractor (including evaluation) Drafting of contracts Comms […]